摘  要:糯扎渡水电站装机容量论证统筹考虑了上下游梯级电站间的合理协调,供电区的负荷水平及负荷特性、电源结构及特性,机组制造水平及运输条件,枢纽布置,动能经济指标,送出工程的经济性和市场竞争力等方面的因素,针对核心问题和关键因素,经综合技术经济比较,最终确定电站装机规模。Demonstration on installed capacity of a super hydropower project is provided with very difficult and challenge. In making a reasonable decision, the research of multifarious factors is a must. In order to demonstrate installed capacity of Nuozhadu hydropower project, the various factors that are coordination between up and down cascaded hydropower project, load level and load-characteristics and framework of electrical source of power supply district, manufacture level and transport condition of generating unit, hydraulic structure design, energy Economy Index, economical rationality of transmission line, market competition ability and so on, are investigated. Aiming at important matters and factors, technical and economic Index have been compared synthetically. And then, the installed capacity of Nuozhadu hydropower project is recommend.

关 键 词:装机容量 枢纽布置 可行性 糯扎渡水电站 

分 类 号:TM312[电气工程—电机]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象