检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国水电顾问集团昆明勘测设计研究院,云南昆明650051
出 处:《水力发电》2005年第5期23-25,共3页Water Power
摘 要:糯扎渡水电站建设规模大,环境影响因素多且涉及面广。为此,分析了工程区环境现状及主要环境敏感保护目标,对水库淹没、水库蓄水运行、陆生生物、鱼类、水土流失、移民安置社会环境,以及施工期三“废”和噪声排放等环境影响问题提出了减免措施。The construction of Nuozhadu Hydropower Station is large in construction scale with many environment impact factors and wide involving aspect. Therefore this paper analyzes the status quo of environment in the project area, major sensitive protecting objectives and puts forward the alleviation measures for the environment impact problems such as reservoir inundation, the operation of reservoir impoundment, biology, fishery, soil and water losses, social environment of resettlement, the waste materials and noise during construction period.
分 类 号:X322[环境科学与工程—环境工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3