检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国水电顾问集团昆明勘测设计研究院,云南昆明650051
出 处:《水力发电》2005年第5期33-34,共2页Water Power
摘 要:糯扎渡水电站工程地质条件复杂,尤其是坝址右岸存在的构造软弱岩带有渗透变形稳定问题,对坝基的工程地质条件影响极大。根据软弱岩带的工程地质特性,对渗透变形稳定问题进行了专门的现场试验研究,并结合试验成果对构造软弱岩带的渗透稳定性进行了初步分析,提出了相应的工程处理措施。The engineering geological conditions of the Nuozhadu hydropower project are very complex, especially for right-bank weakened rock zone. The zone has seepage deformation problems, which produces huge effect on the engineering geological conditions of dam foundation. This paper, based on the engineering geological characteristic of weakened rock zone, describes the special field tests on the stability of seepage deformation. In combination with the test results, it analyzes preliminarily the seepage stability of weak rock zone and puts forward the corresponding engineering treatment measures.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.149.249.124