糯扎渡水电站右岸构造软弱岩带渗透稳定性研究  

Study on the seepage stability of the right-bank weakened zone of Nuozhadu Hydropower Station

在线阅读下载全文

作  者:李宝全[1] 张瑞[1] 

机构地区:[1]中国水电顾问集团昆明勘测设计研究院,云南昆明650051

出  处:《水力发电》2005年第5期33-34,共2页Water Power

摘  要:糯扎渡水电站工程地质条件复杂,尤其是坝址右岸存在的构造软弱岩带有渗透变形稳定问题,对坝基的工程地质条件影响极大。根据软弱岩带的工程地质特性,对渗透变形稳定问题进行了专门的现场试验研究,并结合试验成果对构造软弱岩带的渗透稳定性进行了初步分析,提出了相应的工程处理措施。The engineering geological conditions of the Nuozhadu hydropower project are very complex, especially for right-bank weakened rock zone. The zone has seepage deformation problems, which produces huge effect on the engineering geological conditions of dam foundation. This paper, based on the engineering geological characteristic of weakened rock zone, describes the special field tests on the stability of seepage deformation. In combination with the test results, it analyzes preliminarily the seepage stability of weak rock zone and puts forward the corresponding engineering treatment measures.

关 键 词:软弱岩带 渗透变形 稳定性分析 糯扎渡水电站 

分 类 号:TU457[建筑科学—岩土工程] TV741[建筑科学—土工工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象