检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国水电顾问集团昆明勘测设计研究院,云南昆明650051 [2]中国水电工程顾问集团公司,北京100011
出 处:《水力发电》2005年第5期40-42,共3页Water Power
摘 要:糯扎渡工程在可行性研究阶段,比较了直心墙堆石坝和斜心墙堆石坝两种方案,分析表明,直心墙堆石坝在坝坡稳定性、坝体应力及抗震性方面均满足设计要求,且在地形地质条件、基础处理、抗震性能、施工方便性、工程造价等方面不同程度地优于斜心墙堆石坝,因此,设计最终选择直心墙堆石坝方案。The comparison of two alternatives, that is, the rockfill dams with vertical core and inclined core, is carried out. The analysis showed that the rockfill dam with vertical core can meet the requirements of design in following aspects, stability of dam slope, the stresses of dam body and earthquake resistance. And it has more advantage than that of another alternative in following aspects: topographic and geologic conditions, foundation treatment, ability of anti-earthquake, construction condition, and project cost.
关 键 词:直心墙堆石坝 斜心墙堆石坝 稳定性 应力应变 水力劈裂 糯扎渡水电站
分 类 号:TV641.41[水利工程—水利水电工程] TV641.42
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7