检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]国际泥沙研究培训中心,北京100044 [2]中国水利水电科学研究院泥沙研究所,北京100044
出 处:《人民长江》2005年第7期38-40,共3页Yangtze River
摘 要:三座店水库位于高含沙的阴河,水库面临着严重的泥沙淤积问题。水资源供给和水库淤积存在着尖锐的矛盾。利用一维不平衡输沙数学模型,对水库的淤积进行了计算分析。综合考虑了水库设计中的主要因素,如水库运行方式、大坝规模、坝址、泄流设施等因素。并探讨研究了降低水库运行水位以及利用异重流排沙等措施减小水库淤积的可行性,对水库运行50a后的泥沙淤积情况进行了预测。The Sanzuodian reservoir is located on the Yinhe river with high sediment content and the reservoir faces severe sediment deposition problem. Violent contradiction is developing between water supply and reservoir sediment deposition. In this paper, a one-dimension unbalanced sediment transportation mathematical model is used to compute the sedimentation deposition in the reservoir. The main factors in reservoir design are considered, such as the reservoir operation mode, the dam scale, the dam site, flood discharge facilities etc. The feasibility of reducing the reservoir sedimentation by lowering the reservoir operation level and using density flow to flush sediment is studied and the sedimentation condition after 50 years of the reservoir operation is forecasted.
关 键 词:泥沙淤积 数学模型 运行方式 异重流 三座店水库
分 类 号:TV697.22[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249