红石岩水电站工程动床模型试验研究  被引量:5

Test study on the movable-bed model for Hongshiyan Hydropower Station

在线阅读下载全文

作  者:刘国贵[1] 刘国华[1] 陈斌[2] 

机构地区:[1]浙江大学,浙江杭州310027 [2]浙江水利水电专科学校,浙江杭州310018

出  处:《水力发电》2005年第6期27-28,44,共3页Water Power

摘  要:待建的红石岩水电站水库属严重淤沙型水库,通过动床水工模型试验和有关研究分析发现,其冲沙闸排沙效果不理想,引水隧洞存在进沙严重的隐患。为此,提出了增设一道导墙的方案,以减少引水隧洞进沙并提高冲沙闸排沙效果。同时,从提高电站的经济效益考虑,对运行方式提出了建议。Based on the moveable-bed model tests and some relative studies, it is found that the proposal reservoir for the Hongshiyan Hydropower Station will be a heavy deposit reservoir, its sand-flushing sluice could not effectively de-silt and serious hidden-troubles exist in its diversion tunnel. For this reason, this paper puts forward a guide wall should be increased to reduce the sand flowing into the tunnel and increase sand-flushing effectiveness of sand gate. In addition, several operation suggestions have also been advised to enhance economic benefits of the hydropower station.

关 键 词:导墙 导沙坎 冲沙闸 动床模型试验 红石岩水电站 

分 类 号:TV731[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象