检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]浙江大学,浙江杭州310027 [2]浙江水利水电专科学校,浙江杭州310018
出 处:《水力发电》2005年第6期27-28,44,共3页Water Power
摘 要:待建的红石岩水电站水库属严重淤沙型水库,通过动床水工模型试验和有关研究分析发现,其冲沙闸排沙效果不理想,引水隧洞存在进沙严重的隐患。为此,提出了增设一道导墙的方案,以减少引水隧洞进沙并提高冲沙闸排沙效果。同时,从提高电站的经济效益考虑,对运行方式提出了建议。Based on the moveable-bed model tests and some relative studies, it is found that the proposal reservoir for the Hongshiyan Hydropower Station will be a heavy deposit reservoir, its sand-flushing sluice could not effectively de-silt and serious hidden-troubles exist in its diversion tunnel. For this reason, this paper puts forward a guide wall should be increased to reduce the sand flowing into the tunnel and increase sand-flushing effectiveness of sand gate. In addition, several operation suggestions have also been advised to enhance economic benefits of the hydropower station.
关 键 词:导墙 导沙坎 冲沙闸 动床模型试验 红石岩水电站
分 类 号:TV731[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.15.220.106