检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]成都勘测设计研究院,四川成都610072 [2]中国水利水电建设工程咨询公司,北京100011
出 处:《水力发电》2005年第6期51-53,共3页Water Power
摘 要:长期以来,我国水电站水轮机进水阀选择蝴蝶阀或球阀通常以200m水头为界。民治水电站最大水头238.46m,随着新规范的出台,水轮机进水阀型式采用蝴蝶阀还是球阀还需仔细斟酌。通过对两种阀型进行技术经济比较、设计制造难度与可行性分析,认为民治水电站水轮机进水阀采用蝴蝶阀是完全可行的。For a long time, the head limit of choosing butterfly valves or spherical valves for inlet valve of turbine is 200 m as usual. The maximum head of Minzhi Hydropower Station is 238.46 m so that it should be considered carefully that choosing butterfly valves or spherical valves with new criterion coming on. After making technical and economic comparison, analyzing the difficulty of design manufacture and the feasibility of such two kinds of valves, this paper draws a conclusion that choosing butterfly valves for inlet valve of the turbine of Minzhi Hydropower Station is fully feasible.
分 类 号:TV732.7[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.195