检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]黄河水利委员会防汛办公室,河南郑州450003 [2]黄河勘测规划设计有限公司,河南郑州450003
出 处:《人民黄河》2005年第7期7-9,共3页Yellow River
摘 要:在黄河调水调沙过程中,水沙联合调度的方式主要有单库调度、二库联调、三库联调、四库联调及五库联调等。水沙联合调度分预决策、决策、实时调度修正及调度效果评价4个阶段,不同阶段实施的技术路线有所不同。通过分析水沙联合调度的方式,给出了以四库联调为例的技术路线。同时指出:黄河调水调沙的调度方式是多种多样的,随着来水来沙条件、下游河道边界条件以及各水库工程边界条件的变化,其调度方式需要在实践中不断深化、调整,相关的技术支持也需要进一步深化研究。During the Yellow River water and sediment regulation, the main ways of joint regulation are single reservoir regulation, two reservoirs join regulation, three reservoirs join regulation, four reservoirs join regulation and five reservoirs join regulation. It has 4 phases of pre-decision making, decision making, real time regulation and correction and regulation effect evaluation, carrying out a different technical line for different phases. The paper presents a technical line by taking four reservoirs join regulation as a case through the analysis of water and sediment joint regulation. It also points out that the water and sediment regulation of the Yellow River is manifold, the way of regulation needs to continuously adjust in practice and correlated technical support also needs to be further studied along with the variations of coming water and sediment conditions and the boundary conditions of the channel in the lower reaches and each reservoir.
分 类 号:TV697[水利工程—水利水电工程] TV85
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.42