南水北调西线一期调水时黄河上游水力发电的补偿效益  被引量:2

Power generation compensation benefit of the upper Yellow River in the first stage of the South-to-North Water Transfer West Route Project

在线阅读下载全文

作  者:刘涵[1] 黄强[1] 夏忠[1] 彭少明[1] 

机构地区:[1]西安理工大学水利水电学院,陕西西安710048

出  处:《河海大学学报(自然科学版)》2005年第4期399-403,共5页Journal of Hohai University(Natural Sciences)

基  金:国家自然科学基金资助项目(50479024);青海省科技厅资助项目(2004-G-158)

摘  要:按照跨流域补偿效益计算的基本原则,应用黄河干流梯级水库补偿效益仿真模型计算了南水北调西线一期工程调水40亿m3时黄河上游龙—青河段梯级水库的发电补偿效益.结果表明,在现有装机容量下,南水北调西线一期调水时,黄河上游龙—青段25座梯级电站年发电量可增加88.52亿kW.h,仅节约燃料费和运行费所产生的年发电补偿效益就达8.55亿元.Based on the basic principle of inter-basin compensation benefit calculation, the compensation benefit simulation model for cascade reservoirs on the mainstream of the Yellow River was adopted to calculate the power generation compensation benefit for the cascade reservoirs on the Long-Qing section of the upper Yellow River after a volume of water diversion 4010~8?m^3 in the first stage of the South-to-North Water Transfer West Route Project. The result shows that, under the present installed capacity, the power generation of 25 cascade power plants on the Long-Qing section can increase by 88.5210~8 kWh for such a volume of water diversion, and that the annual power generation compensation benefit resulted from saving of fuel and decrease of operational cost can reach 8.5510~8?Yuan.

关 键 词:南水北调西线一期工程 黄河上游 发电 补偿效益 

分 类 号:TV212.3[水利工程—水文学及水资源]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象