检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]西安理工大学水利水电学院,陕西西安710048
出 处:《河海大学学报(自然科学版)》2005年第4期399-403,共5页Journal of Hohai University(Natural Sciences)
基 金:国家自然科学基金资助项目(50479024);青海省科技厅资助项目(2004-G-158)
摘 要:按照跨流域补偿效益计算的基本原则,应用黄河干流梯级水库补偿效益仿真模型计算了南水北调西线一期工程调水40亿m3时黄河上游龙—青河段梯级水库的发电补偿效益.结果表明,在现有装机容量下,南水北调西线一期调水时,黄河上游龙—青段25座梯级电站年发电量可增加88.52亿kW.h,仅节约燃料费和运行费所产生的年发电补偿效益就达8.55亿元.Based on the basic principle of inter-basin compensation benefit calculation, the compensation benefit simulation model for cascade reservoirs on the mainstream of the Yellow River was adopted to calculate the power generation compensation benefit for the cascade reservoirs on the Long-Qing section of the upper Yellow River after a volume of water diversion 4010~8?m^3 in the first stage of the South-to-North Water Transfer West Route Project. The result shows that, under the present installed capacity, the power generation of 25 cascade power plants on the Long-Qing section can increase by 88.5210~8 kWh for such a volume of water diversion, and that the annual power generation compensation benefit resulted from saving of fuel and decrease of operational cost can reach 8.5510~8?Yuan.
关 键 词:南水北调西线一期工程 黄河上游 发电 补偿效益
分 类 号:TV212.3[水利工程—水文学及水资源]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3