检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]东南大学热能工程设计研究院
出 处:《电站系统工程》1995年第4期27-32,36,共7页Power System Engineering
摘 要:增压流化床燃烧联合循环(PFBC-CC)被认为是本世纪末至下世纪最有希望的传统燃煤发电的替代技术.本文简单地介绍了目前国外PPBC-CC电站的现状及发展趋势,重点介绍由我院承担总体设计的国家“八五”重点科技攻关项目──我国15MWePFBC-CC中试电站,包括该中试电站的规模、选址、系统、总体布置、研究目标和实施计划以及它的实施对我国的现实意义.The pressurized Fluidized Bed Combustion Combined Cycle (PFBC-CC) is commonly lnown as the most advanced andpromising substitutive technique for conventional coal firedpower generation from the end of this century to the beginningof the next one. In this paper, present condition and tendenceof development of PFBC-CC power plant abroad ale simplysummarizes, and the general design of our country's 15MWePFBC-CC pilot power plant-one of the key research projectsof the eight' Five year' plan is undertaken by our institute areemphatically deseribed, and its scale, location. system gen general layout 9 objicts of research, the construction schedule andits practive significance in China is also described.
分 类 号:TM611.3[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49