千米级斜拉桥施工过程中的索力优化与线形控制研究  被引量:24

CABLE FORCE OPTIMIZATION AND LINETYPE CONTROL FOR THE CONSTRUCTION OF A THOUSANDMETER SCALE CABLESTAYED BRIDGE

在线阅读下载全文

作  者:张建民[1] 肖汝诚[1] 

机构地区:[1]同济大学,上海200092

出  处:《土木工程学报》2005年第7期54-60,共7页China Civil Engineering Journal

基  金:中国博士后科学基金资助项目(2003034279)

摘  要:采用一阶最优化计算方法来确定某千米级斜拉桥的合理施工状态,将斜拉桥成桥后的线形和梁塔的最小弯曲应变能设为目标函数,根据其重要程度的不同,给予不同的加权系数。通过对目标函数的最优化处理,求出各施工阶段的斜拉索索力和主梁的预转折角,用空间非线性有限元模拟了钢箱梁的悬臂拼装过程,为桥梁的施工控制提供依据。This paper adopts the first order optimization method to determine the rational construction state of a thousandmeter scale cable-stayed bridge. The square sum of girder elevation errors and the bending strain energy of the girders and the cable tower constitutes the objective function, with different weighting coefficients. By minimizing the objective function, the tensile force of cables and the prearranged angle of girders in construction state are obtained. Using geometically nonlinear FEM, the actual cantilever construction process of steel box-tion control of the bridge.shapedgirders is simulated. The results provide a basis for the construction control of bridge.

关 键 词:斜拉桥 一阶分析法 合理施工状态 

分 类 号:U443.38[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象