西藏高原地区玉龙铜矿建设的不利因素和应对措施  被引量:4

Unfavorable Factors and Solution Measures on Construction of Yulong Copper Mine at Tibet Plateau

在线阅读下载全文

作  者:艾前胜 王春[2] 罗已翀[3] 马锦忠[3] 

机构地区:[1]甘肃蓝野建设监理公司,兰州730000 [2]北京矿冶研究总院,北京100044 [3]西部矿业股份有限公司,西宁810000

出  处:《有色金属》2005年第3期120-123,共4页Nonferrous Metals

摘  要:通过分析西藏玉龙铜矿湿法炼铜试验厂建设工程实施过程中的遇到的各种困难和所采取的解决办法,总结高原地区矿山工程实施及管理方面的经验。与内地相比,西藏高原地区矿山建设存在与人相关的和与工程外部建设条件相关的两类具挑战性因素。解决好这两类问题,是玉龙铜矿大规模开发建设成功的前提。The experiences on mining engineering practice and management in plateau area are summarized by analysis of the various difficulties met and the solution measures adopted in the construction of the hydrometallurgical pilot plant of Yulong Copper Mine in Tibet. There are two types of the challenging factors concerned with the personal and the external condition of engineering about mine construction in Tibet plateau. To solve these problems very well is the foundation of the successful construction and development for the Yulong Copper Mine.

关 键 词:管理工程 矿山建设 高海拔高寒地区 西藏玉龙铜矿 

分 类 号:TD862.1[矿业工程—金属矿开采] F426.1[矿业工程—矿山开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象