检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]甘肃蓝野建设监理公司,兰州730000 [2]北京矿冶研究总院,北京100044 [3]西部矿业股份有限公司,西宁810000
出 处:《有色金属》2005年第3期120-123,共4页Nonferrous Metals
摘 要:通过分析西藏玉龙铜矿湿法炼铜试验厂建设工程实施过程中的遇到的各种困难和所采取的解决办法,总结高原地区矿山工程实施及管理方面的经验。与内地相比,西藏高原地区矿山建设存在与人相关的和与工程外部建设条件相关的两类具挑战性因素。解决好这两类问题,是玉龙铜矿大规模开发建设成功的前提。The experiences on mining engineering practice and management in plateau area are summarized by analysis of the various difficulties met and the solution measures adopted in the construction of the hydrometallurgical pilot plant of Yulong Copper Mine in Tibet. There are two types of the challenging factors concerned with the personal and the external condition of engineering about mine construction in Tibet plateau. To solve these problems very well is the foundation of the successful construction and development for the Yulong Copper Mine.
关 键 词:管理工程 矿山建设 高海拔高寒地区 西藏玉龙铜矿
分 类 号:TD862.1[矿业工程—金属矿开采] F426.1[矿业工程—矿山开采]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229