电气工程施工的前期技术准备与成本控制  被引量:6

Technical Preparation and Cost Control in Early Stages for Electric Engineering ConstructionComb1

在线阅读下载全文

作  者:常金平[1] 张会爽[1] 苗辉[2] 刘瑞华[3] 李伟[1] 

机构地区:[1]中原石油勘探局工程建设总公司,河南濮阳457001 [2]中原石油勘探局采油二厂,河南濮阳457532 [3]中原石油勘探局设计院,河南濮阳457001

出  处:《石油工程建设》2005年第4期83-84,共2页Petroleum Engineering Construction

摘  要:电气工程前期技术准备工作是否充分,直接关系到工程的进度、质量和成本,文章从审图、设计现场交底、提料、编制技术措施和作业指导书、对施工人员进行技术交底等方面,就前期技术准备工作如何参与成本控制介绍了经验。实践证明,前期工作准备充分,可以有效避免材料浪费、工程返工、人员窝工等问题,大大降低无效成本。This paper introduces the experience of controlling costs in the early stages of technical preparation related to drawing examination design explanation in situ material supply compiling technical measure and operational guidance book technological explanation for construction personnel etc.The practice proves that the sufficient preparation work in the early stages is able to effectively avoid problems such as material waste work to be done over again enforced idleness due to poor organization so that remarkably reduces the ineffective costs.

关 键 词:电气工程 成本控制 准备工作 

分 类 号:TU85[建筑科学] TU712

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象