作 者:李晓宾[1]
机构地区:[1]洛阳有色金属加工设计研究院,河南洛阳471039
出 处:《有色金属设计》2005年第2期7-9,26,共4页Nonferrous Metals Design
摘 要:在我国固定资产投资领域内,普遍存在着概算超估算、预算超概算、决算超预算的现象。究其原因,一是投资目标确定不合理,二是在项目实施过程中,未能进行有效的全过程控制。通过分析工程建设各阶段对建设投资的影响,笔者提出了应在项目实施的全过程中,开展建设监理,即全程监理,这是控制投资的一种有效方法。The phenomena of financial estimation exceeding budget, budget exceeding financial estimation and final accounts exceeding budget exist popularly in our domain of fixed assets investment. The reasons are found as follows: firstly, unreasonably fixing investment targets; secondly, unable to effectively control the whole process of project during the implementation of engineering project. By analyzing the impact of every phase of engineering construction upon construction investment, the author points out that construction supervision, i. e. end - to- end supervision, shall be carried out in whole process of project implementation, because it is an effective method to control investment.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.145.0.77