作 者:谭志勇[1] 李学启[1] 吴云凤[1] 李天骄[1]
机构地区:[1]中水北方勘测设计研究有限责任公司
出 处:《水利水电工程设计》2005年第3期1-3,55,共3页Design of Water Resources & Hydroelectric Engineering
摘 要:根据戈兰滩水电站坝址处地形、地质和工程布置特点,施工导流采用了两岸隧洞泄洪,河床一次性断流的导流方案。在对河流水文、地质特性等方面充分论证的基础上,合理地选择导流洞布置、断面尺寸和支护方式,确定了导流围堰的结构、防渗和防护措施,以及有针对性选择截流方案。本枢纽导截流工程的选择,对于类似工程的导流设计有一定的参考价值。The diversion scheme on discharging flood by the tunnels on both banks and the water interception done only one time is adopted according to the topog raphy and geology at the damsite, and the characteristic of the project layout o f Gelantan Hydropower Station. Based on fully demonstrating the hydrologic and g eological characteristic of the river, the layout of the diversion tunnel, secti onal dimensions and the support method are reasonablly selected and the structur e of the diversion weir, the anti-seepage and protection measures are also deter mined and the river closure scheme is selected specially. Selection of the river diversion and closure scheme for this project is of some importance value to ri ver diversion design for simillar projects.
分 类 号:TV551[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229