检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]长沙矿冶研究院
出 处:《金属矿山》1995年第3期43-46,31,共5页Metal Mine
摘 要:通过西石门铁矿尾矿库的实例和资料计算,汛期洪水将严重威胁坝体安全.文中介绍了采用开挖山坡截洪沟及清理排水隧洞淤泥等措施;采用旋流器和分散管交替排放联合筑坝新工艺,确保了坝体安全,防御了汛期的几次特大暴雨的冲击.Through the analysis of the case of Xishimen Iron Mine's tailing dam and the data calculation,it was known that the flood in the flood season would severely threaten the safety of the dam body.The peper describes how the reservoir has withstood the impact of several strong rainstorms in flood seasons by taking the measures of digging the slope flood-cut off ditches and clearing the silt out of drainage tunnels and by applying the combined new technology of dam construction with alternative placement of hydrocyclones and distribution tubes.
分 类 号:TV649[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.112