软岩巷道支护阻力与围岩变形的关系  被引量:2

Supporting resistance and surrounding rock deformation of soft rock roadway

在线阅读下载全文

作  者:王彩根[1] 陆士良[1] 刘长海[1] 张福祥[1] 

机构地区:[1]中国矿业大学,铁法矿务局

出  处:《矿山压力与顶板管理》1995年第3期118-120,共3页Ground Pressure and Strata Control

摘  要:软岩巷道维护状况及围岩变形量与支护阻力的关系极大,实验与实践表明,支架的高阻和可缩是确保软岩巷道稳定性的关键;受力条件恶化严重抑制着软岩巷道支架支撑能力的发挥;实施支架壁后充填使支架及早承载和均匀受力,可大幅度提高支架的工作阻力,有效地控制巷道围岩的强烈变形。he maintenance status and surroundingrock deformation of soft rock roadway haveimportant relation with supporting resistance.The experiments indicated that the highresistance and yieldability of support are the keyfor ensuring the stability of soft rock roadway,that the worse of applied force condition hadlyrestrains elaboration of supportihg ability ofsupport in soft rork roadway,that carrying outsupport wall back fill makes support be loadedearly and uniform1y, so that the workingresistance of support may be largely increasedand the deformation of roadway surroundingrock may be efficiently controlled.

关 键 词:软岩巷道 围岩变形 巷道支护 矿井支护 

分 类 号:TD353[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象