马钢二铁厂大喷煤实践  

Practice on high pulverized coal injection at the Second Ironmaking Plant of Maanshan Iron & Steel Co.

在线阅读下载全文

作  者:胡夏雨[1] 薛晓天[1] 夏林[1] 

机构地区:[1]马鞍山钢铁股份有限公司

出  处:《炼铁》1995年第5期1-4,共4页Ironmaking

摘  要:从1995年元月开始,马钢二铁厂4座300m^3级高炉实行富氧大喷煤操作,喷吹煤种为无烟煤。在富氧率1%~2%,风温1070℃的条件下,1~5月份全厂平均煤比达130.2kg/t铁,置换比0.828,高炉操作稳定顺行。The high pulverized coal injection with oxygen-enriched blast has been carried out at four 300m3 blast furnaces of the Second Ironmaking Plant of Maanshan 1 & S Co.from January,1995-The injected coal was anthracite-Average coal injection rate for four BFs of 130-2kg/tHM and replacement ratio of 0.828 have been reached,and also a stable and smooth blast furnace operation has been achieved in period from January to May on condition that the oxygen enrichment percentage was 1 %~2%,the blast temperature was 1070℃

关 键 词:高炉 喷煤 富氧鼓风 无烟煤 

分 类 号:TF538.63[冶金工程—钢铁冶金]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象