检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李作斌
机构地区:[1]珠江水利委员会勘测设计研究院
出 处:《人民珠江》1995年第6期27-32,共6页Pearl River
摘 要:本文介绍了高水头混凝土坝泄洪底孔的体型选择及试验研究,选定了斜坡式体型布置。通过空穴特性分析,为保证运行安全,对水流空穴数小于0.3的部位,除严格控制体型和平整度外,文中提出采用两道通气减蚀措施。经通气减蚀试验,确定了通气措施的各项参数。该底孔已建成运行,经初期运行,未见异常。The article presents the configuration determination and test research on discharge orifice of high waterhead concrete dam. The slope type configuration arrangement is determined. To gUarantee the operation safety,besides using the method of configuration and levelling control in the orifice section where the flow cavitation numberis below 0. 3, through cavitation characteristics analysis, the measure of two - ways air ventilation cavitation resistance is presented in this article. All parameters of ventilation measure are determined through ventilation cavitationresistance test. This constructed discharging orifice has been put into operation, being in normal working mode in itsinitial operation stage.
分 类 号:TV642[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28