李家峡水电站高边坡加固实施中的若干问题  被引量:4

Problems arising in high side slope stabilization in Lijiaxia kydropewer station

作  者:何君弼[1] 黄福德[1] 

机构地区:[1]西北勘测设计研究院

出  处:《水力发电》1995年第5期24-27,38,共5页Water Power

摘  要:李家峡水电站地质条件复杂,边坡稳定问题突出,边坡稳定核算及治理设计一直是本工程重要技术问题之一。坝址区开挖边坡中,以双曲拱坝在拱端下游坝肩边坡的稳定尤为突出,是边坡稳定核算和治理的重点区域。在该区域边坡治理实施过程中通过观测资料分析和复核计算,不断地完善、及时修正设计和施工方案,有效地控制了施工期的边坡稳定。Because of complex geological conditions of Lijiaxia hydropower station, slope stability is a striking problem.Check computation of slope stability and treatment design is one of key problems of the project. Among excavation slopes of dam site, the stability of the downstream slope on the left dam abutment is the important area of check computation of slope stability and treatment. In slope treatment of this area, design and construction plan were revised and improved by means of analyzing observation data and recheck computation. This efficiently controlled the slope stability during construction.

关 键 词:水电站 高边坡 稳定性 预锚 锚筋桩 

分 类 号:TV698.235[水利工程—水利水电工程] TV223.34

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象