检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]西北勘测设计研究院
出 处:《水力发电》1995年第6期51-54,共4页Water Power
摘 要:李家峡水电站导流洞进口,地势陡峭,坡面自然高度达200余m。高程2130m平台以下为85m高的洞脸边坡,该部分坡积物清除完后,意外地出现了NS向及NE向两组密集度很高的构造裂隙。这两组裂隙与岩层相互切割形成的不稳定体导致提前进洞失败。因此,如何在裂隙极为发育的薄层混合岩边坡上成洞便成了工程前期的头号技术难题。The upstream side of the diversion tunnel in Lijiaxia Hydropower Station is a steep slope with a height of 200m. Below the terrace with an elevation of 2130m is a side slope with a height of 85 m,where the entrance of the tunnel was planed to be opened. After talus materials were removed,there were two grouped high density formation cracks in direction of NS and NE. The two grouped cracks cut the rock stratum to form a unstable rock body.Thus,how to cut a tunnel under these geologic conditions i& a number one problem.
分 类 号:TV551.12[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.10