检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]水利部珠江水利委员会勘测设计研究院
出 处:《水力发电》1995年第10期42-44,共3页Water Power
摘 要:水库回水计算是确定水库淹没范围,进行规划方案论证的基础工作。由于河道型水库回水情况与一般水库有较大的差异,因此不能采用常规的回水计算成果来确定水库的淹没范围。长洲水利枢纽的实例说明,河道型水库的径流式电站工程,其回水计算方法有别于高坝大库型工程,有更高的精度要求。Calculation of backwater in reservoir is foundational for defining inundated area in a reservoir and demonstration a planned program. Since there is a larger difference between backwater in river-run reservoir and in the general one,the results of the conventional calculation of backwater can not be used to define the inundated area of a river-run reservoir. The example of Changzhou Water Project with a river-run reservoir showed that,in comparison with the large reservoir with a high dam,the calculation of backwater in a river-run reservoir would have the higher precision requirements.
分 类 号:TV747[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.33