集取河床渗透水辐射井的运行分析探讨  

The Operation Analysis of Dug Well with Infiltration Pipes Arranged Radiantly in River Bed

在线阅读下载全文

作  者:王允麒[1] 吴光春[1] 孙存忠 

机构地区:[1]湖南大学,海拉尔忠德水技术研究所,武汉工业大学建筑学院

出  处:《武汉工业大学学报》1995年第3期94-97,共4页

摘  要:通过对长期运行观测资料的分析,查明了河床辐射井长期运行出水量的衰减变化规律及其影响因素所起的相应控制作用。进而指出为获得该类型井长期运行的最佳效果,除设计时应注意从井位的正确选择与合理水位降深的选取等方面来控制淤塞进程外,还强调了在运行中要定期采取空气与高压水同时反冲洗辐射管的技术措施来恢复井的产水能力。Based on analyzing the observed data of long term operation,the attenuation law of yields and the control effect of each affecting factor are found out for dug well with infiltration pipes arranged radiantly in river bed after long term operation. Furthermore,it is worth notice,in order to slow down the attenuation of yields during long term operation,except controling the progressof siltation by properly choosing the location of well and drawdown in design,it is especially important to backwash infiltration pipes by air and high pressure water simltaneously and periodically to resume the yielding capacity of well during operation.

关 键 词:辐射井 河床 取水建筑物 运动分析 渗透水 

分 类 号:TV671[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象