检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]电力工程学院,云南工业大学
出 处:《云南工业大学学报》1995年第4期1-7,共7页
基 金:云南省应用基础研究基金
摘 要:本文通过试验分析,对设置在高坎宽顶堰上的阶梯坝面消能工的水流特性进行了系统研究,并与无阶梯溢流坝作比较后认为:在阶梯溢流坝面上形成的滑掠水流流态,使泄流水舌表面充分掺气,底缘形成含气漩滚。掺气后的水深和流速沿程保持稳定,可大量消散泄流动能,改善坝址下游的水力条件。设置于溢流坝面的阶梯是一种有效的消能工,并具有一定的防空蚀作用。阶梯消能的效果,与下泄单宽流量、坝高、台阶高度、溢流坝面斜率及堰面上滑掠水流的流程长度有关。The hydraulic characteristics of stepped dissipation on the spillway face with ahigh sill broad一crested weir are sys tematicaIIy studied by experiment. From comparisonwith the conventional spillway,it is seen that skimming flow formed on the steppedspillway face makes a full entrainment of air into the discharge,and the horizontal axisvortices with much air are developed on the stepped face。The depth and velocitv of aer。ated flow are almost unchanged along the flow course,Agreat amount of flOw energycan be dissipated by the stepped spillway.Hence,the hydraulic conditions in thedownstream can be greatly improved.The periment resuIts show that the steps located onspillway face are an effective dissipator and cavitation of the spillway can be preventedto some exent.The effciency of this energy dissipator depends on weir height,unitdischarge, step height and step number,as well as spillway face slope and the skimmingflow length along the stepped spillway face。
分 类 号:TV652.1[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145