作 者:李怀斌
机构地区:[1]贵州中水建设项目管理有限公司,贵州贵阳550002
出 处:《贵阳学院学报(自然科学版)》2010年第4期50-55,共6页Journal of Guiyang University:Natural Sciences
摘 要:马槽河水电站拦河大坝是一座外掺MgO不分横缝的拱坝,在施工图阶段通过对坝址地质条件深入细致的研究,将初步设计阶段的抛物线拱圈优化为统一二次曲线形拱圈的双曲拱坝,在使坝体应力水平及坝肩抗滑稳定满足要求的前提下,节省了坝基开挖及坝体混凝土工程量;同时采用MgO筑坝技术,降低了施工难度,使得电站提前发电。获得了良好的经济效益及社会效益。The Macao River hydropower dam is an additive MgO style arch dam without joints.Researchers optimized the parabolic arch ring which had been designed at preliminary stage into unified quadratic curve-arch ring of double curved arch dam by intensive research on the geological conditions during the stage of construction.Under the premise of meeting the requirements of the dam stress level and the abutment's anti-sliding stability,constructors saved much project of dam foundation's excavation and dam concrete.At the same time,researchers adopted MgO Dam's construction technology,reducing the difficult in construction and made the power generation in advance which had an economic efficiency and social efficiency.
关 键 词:双曲拱坝 设计阶段 施工优化 Arch Dam 坝肩抗滑稳定 坝体混凝土 筑坝技术 应力水平 施工难度 社会效益 拦河大坝 经济效益 拱圈优化 水电站 地质条件 不分横缝 坝基开挖 一二次 施工图 抛物线
分 类 号:G64[文化科学—高等教育学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15