110kV连南线导线舞动原因分析及治理  被引量:1

Cause Analysis and Regulation of 110kV Wire Swaying in Liannan Transmission Line

在线阅读下载全文

作  者:王波 毛吉贵 马学荣 

机构地区:[1]宁夏吴忠供电局,宁夏吴忠751100

出  处:《水电能源科学》2010年第8期148-150,120,共4页Water Resources and Power

摘  要:基于110 kV连南线同塔双回垂直排列线段现状和舞动模型调查,分析了导线的舞动原因,研究了导线发生舞动机理,提出了无覆冰的邓哈托舞动模式。并比较分析了集中安装重锤和相间间隔棒两种方案。结果表明,选择相间间隔棒方案可治理导线舞动,提高了输电线路的供电可靠性和健康运行水平,为输电线路因特殊风向诱发的邓哈托舞动模式治理提供了参考依据。Based on investigation of the status of 110 kV Liannan transmission line double circuit section where the line is vertically arranged on the same tower,and the swaying pattern,the main cause of the wire swaying is analyzed.Then,the swaying mechanism of the wire is studied,and the Den Hartog swaying pattern without ice coating is put forward.Specifically,two schemes,centralized heavy-punch installation and inter-phase spacers,are compared.The results show that the scheme of inter-phase spacers can bring the wire swaying under control and enhances the reliability and safety of the power supply transmission lines,which provides basis for regulation of the Den Hartog pattern swaying induced by particular wind directions in transmission lines.

关 键 词:110kV 导线舞动 原因分析 治理 Transmission Line REGULATION 相间间隔棒 输电线路 供电可靠性 运行水平 舞动模型 舞动机理 同塔双回 模式 集中安装 方案 垂直排列 参考依据 比较分析 重锤 

分 类 号:TK79[动力工程及工程热物理—流体机械及工程] TV7[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象