检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《水力发电》2010年第8期78-80,共3页Water Power
基 金:国家自然科学基金重点资助项目(50539140);国家自然科学基金资助项目(50679098);国家科技支撑计划(2008BAB29B09);美国能源基金会"中国可持续能源"(G-0610-08581)资助项目
摘 要:梯级水电站日优化调度模型在考虑电网负荷要求和梯级水电站各机组的振动区的前提下,采用电网允许的峰平谷负荷比约束日内各时段的出力,达到了减少机组起停次数的目的。模型采用动态定出力求解,以梯级电站发电收入最大化为目标,并用实例对此模型进行了计算。计算过程和结果表明,动态定出力求解时间短,优化结果与目前的电网需求相一致。A new optimal operation model of cascade hydropower stations can minimize the start-stop times of hydroelectric units and maximize the generation benefit after considering the power system load and the unstable operation zones of hydropower units and taking permitted peak,average and valley load ratio as the constraints of output.The model was solved by dynamic programming algorithm and under the condition of fixed output regulation.The case study shows that the optimal operation can meet the demand of power system.
关 键 词:分时电价 梯级水电站 优化调度模型 HYDROPOWER Stations Cascade Model 电网负荷 收入最大化 优化结果 梯级电站 求解 计算过程 机组起停 动态 振动区 负荷比 约束 需求 时间 时段
分 类 号:TV73[水利工程—水利水电工程] TM612[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.13