红水河干流梯级开发对水温累积影响的调查研究  被引量:13

Study on Cumulative Effects to Water Temperature Caused by the Hydropower Cascade Development in Hongshui River

在线阅读下载全文

作  者:薛联芳[1] 顾洪宾[2] 崔磊[2] 杨文正[1] 韦兵[3] 齐彦斌 

机构地区:[1]中国水电顾问集团中南勘测设计研究院,湖南长沙410014 [2]水电水利规划设计总院,北京100120 [3]广西电力工业勘察设计研究院,广西南宁530023 [4]龙滩水电开发有限公司,广西南宁530028

出  处:《水力发电》2010年第11期5-8,共4页Water Power

摘  要:根据红水河干流梯级开发前后,天生桥至迁江河段各水文站水温观测资料和部分水库水温实测数据,采用对比和相关分析的方法,探讨了水电梯级开发对水温的累积影响。研究结果表明:天生桥一级水库和龙滩水库水温结构为分层型;天生桥一级水库下游梯级春、夏两季水温明显低于建库前河流水温,秋、冬两季则有所提高,影响程度随下游距离增加逐渐减小,影响距离约300 km。研究成果可为评价水电梯级开发对水温的影响并制定减缓影响的对策提供依据。The cumulative effects on water temperature caused by the hydropower cascade development were studied by comparing the monitoring data before and after the developments in Hongshui River between Tianshengqiao and Qianjiang.The results show that,the water temperature structures of Tianshengqiao I and Longtan reservoir are stratified,the water temperatures in the downstream of Tianshengqiao I Reservoir in spring and summer are significantly lower than the data before development and slightly higher in autumn and winter,and the influences of Tianshengqiao I on downstream water temperature is gradually decreased with the increase of distance and the maximum influence distance is about 300 km.The study provides the basis for evaluating the influence on water temperature caused by hydropower cascade development and developing mitigation countermeasures.

关 键 词:红水河 干流 水电梯级开发 水库水温 累积影响 调查研究 Development Cascade Water Temperature 天生桥 一级水库 分析的方法 影响距离 影响程度 研究成果 水库下游 水温结构 实测数据 龙滩水库 观测资料 

分 类 号:TV73[水利工程—水利水电工程] TM612[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象