作 者:邹丽春[1]
机构地区:[1]中国水电顾问集团昆明勘测设计研究院,云南昆明650051
出 处:《水力发电》2010年第12期15-19,共5页Water Power
摘 要:小湾水电站位于我国西南高山峡谷地区,地形地质条件复杂,坝高、库大,泄洪流量及功率大,技术难度高,在许多方面均超越了现行规程规范及以往的认知,极具挑战性。该工程复杂高边坡、拱坝及拱座、坝基岩体开挖卸荷松弛、混凝土骨料料源、拱坝混凝土温控及裂缝、物探检测与安全监测、引水发电系统及临时设施、"数值小湾"等方面积累的经验和教训,必将使我国的高拱坝建设迈上一个新台阶。The Xiaowan Hydropower Project,located in mountain valley in southwest China,is a great challenge for the construction as the complex topographical and geological conditions,high arch dam,huge reservoir volume,large discharge flow and energy and other special technology problems.Many technical requirements have transcended the provisions of existing standards and specifications and the previous knowledge.A wealth of experiences and lessons have been gained from the design,research and construction of complex high slope,arch dam and abutment,dam bedrock excavation unloading and relaxation,the material source of concrete aggregate,dam concrete temperature control and cracking,physical prospecting and detection,security monitoring,diversion-power generating system and temporary facilities,and 'Numerical Xiaowan'.The constructing practice of Xiaowan Project makes the construction of high arch dam in China to a new level.
关 键 词:小湾水电站工程 Xiaowan Hydropower Project Thinking 引水发电系统 拱坝混凝土 高山峡谷地区 混凝土骨料 岩体开挖 卸荷松弛 物探检测 临时设施 技术难度 规程规范 地质条件 安全监测 挑战性 高拱坝 高边坡 泄洪 温控
分 类 号:TV73[水利工程—水利水电工程] TM612[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117