伊洛瓦底江上游电源电站孤网运行探讨  被引量:6

Discuss on the Isolated Operation of Power Station for the Hydropower Development of Irrawady River Upper Reach

在线阅读下载全文

作  者:郑福民 张幸幸 

机构地区:[1]中电投云南国际电力投资有限公司,云南昆明650224

出  处:《水力发电》2010年第12期69-71,87,共4页Water Power

摘  要:针对缅甸伊洛瓦底江上游梯级电站电源电站孤网运行的特点,结合电源电站自身的出力特性和供电期间的缺口电量分析,认为采取实行施工错峰用电,用柴油发电机作为备用电源,增设功率平衡器,配置安全稳定装置等措施可适当解决电网中存在的问题。The power station for supplying power to the hydropower development project construction of Irrawady River in Burma is isolated operation.Based on the outlet characteristics and the power supplying gap of power station,the measures including constructing in different peak load period,using diesel generators as backup power,and installing additional power balancer and stability controller are applied.The problems of the isolated power grid are solved.

关 键 词:伊洛瓦底江 上游 电源电站 孤网运行 Reach Upper HYDROPOWER Development Power Station 柴油发电机 稳定装置 梯级电站 电量分析 错峰用电 出力特性 备用电源 平衡器 问题 特点 施工 配置 

分 类 号:TV73[水利工程—水利水电工程] TM612[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象