黄河玛曲段高原水运建设可行性探讨  

Feasibility Discussion on Plateau Waterway Construction of Maqu Segment in Yellow River

在线阅读下载全文

作  者:许乐华[1] 许鹏山 

机构地区:[1]河海大学水利水电学院,江苏南京210098 [2]甘肃省水运管理局,甘肃兰州730046

出  处:《水电能源科学》2010年第7期118-120,173,共4页Water Resources and Power

基  金:国家自然科学基金资助项目(50779037);交通部西部交通建设科技基金资助项目(200832874602)

摘  要:针对黄河玛曲航段交通运输不便、人民生活条件落后等现状,在分析黄河玛曲段航运现状基础上,提出了最小航道尺度确定、航道整治等工程设计方案,并从社会效益、国民经济效益和环境效益三方面进行效益评估,得出该航段水运建设带来的效益远大于国家和社会为其投入的代价,工程可行。Aiming at the current situation of inconvenient transport and bad living conditions for Maqu segment in Yellow River,engineering design scheme including determination of minimum waterway scale and channel improvement is proposed on the basis of waterway current status analysis.Further more,benefit assessment is discussed from the aspects of social,economic and environmental benefits for the feasibility of this project.Comparing benefits of this project with cost invested by the state and society,it can be concluded that this project is feasible.

关 键 词:黄河 高原 水运建设 可行性探讨 国民经济效益 工程设计方案 国家和社会 效益评估 生活条件 社会效益 交通运输 环境效益 航道整治 航道尺度 投入 基础 航运 分析 

分 类 号:TK79[动力工程及工程热物理—流体机械及工程] TV7[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象