检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]河海大学水利水电学院,江苏南京210098 [2]甘肃省水运管理局,甘肃兰州730046
出 处:《水电能源科学》2010年第7期118-120,173,共4页Water Resources and Power
基 金:国家自然科学基金资助项目(50779037);交通部西部交通建设科技基金资助项目(200832874602)
摘 要:针对黄河玛曲航段交通运输不便、人民生活条件落后等现状,在分析黄河玛曲段航运现状基础上,提出了最小航道尺度确定、航道整治等工程设计方案,并从社会效益、国民经济效益和环境效益三方面进行效益评估,得出该航段水运建设带来的效益远大于国家和社会为其投入的代价,工程可行。Aiming at the current situation of inconvenient transport and bad living conditions for Maqu segment in Yellow River,engineering design scheme including determination of minimum waterway scale and channel improvement is proposed on the basis of waterway current status analysis.Further more,benefit assessment is discussed from the aspects of social,economic and environmental benefits for the feasibility of this project.Comparing benefits of this project with cost invested by the state and society,it can be concluded that this project is feasible.
关 键 词:黄河 高原 水运建设 可行性探讨 国民经济效益 工程设计方案 国家和社会 效益评估 生活条件 社会效益 交通运输 环境效益 航道整治 航道尺度 投入 基础 航运 分析
分 类 号:TK79[动力工程及工程热物理—流体机械及工程] TV7[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.112