机构地区:[1]国电大渡河流域水电开发有限公司,四川成都610041 [2]四川大学水利水电学院,四川成都610065 [3]中国水电顾问集团成都勘测设计研究院,四川成都610072
出 处:《水利水电技术》2012年第1期61-64,68,共5页Water Resources and Hydropower Engineering
摘 要:大岗山水电站坝址区设计地震峰值加速度达到557.5 cm/s2,大岗山拱坝的最大坝高达210 m,其地震动响应规律复杂,通过前期勘测设计阶段系统、全面的研究,抗震方面存在的有关问题在可行性研究阶段已基本明确,采取的相应工程措施满足可行性研究阶段工程抗震的要求,大岗山拱坝的抗震安全性能够得到保证。The design peak seismic acceleration within the site area of Dagangshan Hydropower Station is to reach 557.5 cm/s2 with a complicated law of seismic dynamic response,moreover,the maximum height of the arch dam for the hydropower station is to be 210 m.Therefore,a systematic and comprehensive seismic study on the dam is just made during the phase of the early-stage investigation and design for the project,and then,the related seismic problems are clarified and the relevant engineering countermeasures to be adopted therein can meet the seismic requirements for the feasibility study concerned as well.Therefore,the seismic safety of the arch dam for Dagangshan Hydropower Station can be surely guaranteed.
分 类 号:TV6[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.220.97.0