摘  要:山西省小浪底引黄工程是山西省大水网建设重点项目之一,引水干线隧洞长52.77 km,其中土洞段11.88km,地质条件复杂,施工困难。文中叙述了该隧洞土洞段施工条件,对其开挖及衬砌施工方法(全机械化盾构和人工开挖法)进行分析、比较与探讨。Xiaolangdi Yellow River Diversion Project is one of the key projects in large water network construction in Shanxi Province.Its main line length of water diversion tunnel is 52.77km.,the length of soil tunnel in which is 11.88 km.Geologic condition of soil tunnel is complex.Its construction is difficult.The article introduces construction condition of this soil tunnel,analyzes and compares this tunnel's excavating and lining methods(including shield machine method and manual construction method).

关 键 词:小浪底引黄 长隧洞 施工技术 

分 类 号:TV5[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象