朔州神头泉水置换厂预应力钢筒混凝土管(PCCP)安装施工中所遇问题和处理对策  被引量:1

Encountered Problems and Their Treatment Measures during the Construction Period to Install PCCP of Shentou Springwater-replacing Plant in Shuozhou City

在线阅读下载全文

作  者:郝东红 

机构地区:[1]山西省晋中市水利建筑工程总公司,山西晋中030600

出  处:《山西水利科技》2012年第1期57-58,61,共3页Shanxi Hydrotechnics

摘  要:在朔州市神头泉水置换水厂预应力钢筒混凝土管线工程施工中,遇到了一系列影响安装的问题,诸如橡胶密封圈的合理选择性、气温对安装的影响、如何处理椭圆度带给安装的影响、预应力钢筒混凝土、(PCCP)包封混凝土施工中的教训和经验等,文中对之详尽地进行了阐述。During the construction period to install PCCP of Shentou Spingwater-replacing Plant in Shuozhou City,a series of problems that influences installation job was encountered,including how to reasonably select rubber water-seal ring,the influence of air temperature on installation job,how to treat the problem brought by elipticity of steel circle on pipe joint and the experiences and lessons in the process to place concrete surrounding PCCP etc.All of these are detailed in this paper.

关 键 词:预应力钢筒混凝土管 橡胶密封圈 椭圆 温度差 湿陷性 

分 类 号:TV5[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象