检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:蒋逵超[1] 申艳[1] 伍鹤皋[1] 杨志宏[2] 郭志兵[2]
机构地区:[1]武汉大学水资源与水电工程科学国家重点实验室,湖北武汉430072 [2]四川省水利水电勘测设计研究院,四川成都610072
出 处:《水电能源科学》2005年第4期4-7,共4页Water Resources and Power
摘 要:结合紫坪铺水利枢纽工程的实际,采用三维有限元方法对该工程发电引水系统取消伸缩节后的抗震性能进行了研究。计算结果表明,主厂房上游永久分缝处以一段垫层管代替常规伸缩节以后,压力管道在地震荷载和内水压力等荷载组合作用下,结构的动力响应可以满足使用要求,从而达到取消伸缩节、节省工程投资的目的。In accordance with the practice of Zipingpu hydraulic engineering project, a study on the earthquake resistance after cancellation of expansion joints in the conduit system ahead of powerhouse has been carried out by means of 3-D FEM. Results of calculation show that it is absolutely feasible to replace the expansion joint ahead of the powerhouse by a steel pipe with cushion layer outside, considering the common effect of earthquake and inside water pressure. As a result, the engineering investment can be saved because of the cancellation of expansion joints.
分 类 号:TV732[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.144.161.117