检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《山东冶金》2005年第3期29-30,共2页Shandong Metallurgy
摘 要:采用BR1.1XC(1.0/100)142型板式换热器冷却,以低温矿井水为冷媒水,对高炉冷却系统进行了改造,替代了冷却塔,节省了一次性建设费用和日常运行费用。应用表明,高炉供水温度稳定在30~36℃,比采用冷却塔降低约15℃。In order to decrease the cost, the blast furnace cooling system is changed by adopting BRI.IXC (1.0/100)142 type plate heat exchanger for cooling, using low temperature mine water as refrigerant. Therefore the cooling tower is substituted and only one time establishment charges and running cost are saved. Application shows that the water supply temperature for the blast furnace is stabilized from 30℃ to 36℃ and is reduced by 15℃ comparing with using cooling tower.
分 类 号:TF066.7[冶金工程—冶金物理化学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.182