巴山水电站溢洪道导水墙体型优化试验研究  被引量:8

Experimental research on form optimization for guide wall of spillway of Bashan Hydropower Project

在线阅读下载全文

作  者:王均星[1] 白呈富 李泽[1] 

机构地区:[1]武汉大学水资源与水电工程科学国家重点实验室,湖北武汉430072

出  处:《武汉大学学报(工学版)》2005年第4期5-8,共4页Engineering Journal of Wuhan University

摘  要:为改善巴山水电站溢洪道进水渠流态、提高泄流能力,通过一系列试验优化了溢洪道引水渠左导墙头部曲线型式.结合工程实际和以往经验,比较了9种进水口曲线型式的试验结果,确定了长短轴黄金分割比的椭圆弧面的方案.进一步的试验证明了该方案无论在流态上还是在泄流能力方面都达到了令人满意的效果.To improve the flow pattern and discharge capacity of the spillway of Bashan Hydropower Station, the left guide wall's form of the spillway's entrance channel is optimized by series of model tests. Taking practical situation of this project and much engineering experience into account, the scheme with axle golden section elliptical arc surface is proposed through comparing nine optimization schemes with model test. Further tests show that this scheme is satisfactory in both flow pattern and discharge capacity.

关 键 词:模型试验 溢洪道 优化 

分 类 号:TV651.1[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象