作 者:黄亚继[1] 金保升[1] 仲兆平[1] 肖睿[1] 方捍红 胡建华
机构地区:[1]东南大学洁净煤发电和燃烧技术教育部重点实验室,南京210096 [2]广东粤阳发电有限公司,阳山513100
出 处:《动力工程》2005年第4期503-507,522,共6页Power Engineering
摘 要:详述了130t/h鼓泡床改造为飞灰底饲回燃循环流化床锅炉的设计思路和实施方案,分析对比了改造前后锅炉主要参数,并进行了投资经济性分析。结果表明:采用的扩容增效方案是切实可行的;锅炉蒸发量由原来的114.9t/h增至144.6t/h;发电功率由原来的22.8MW增至29.6MW;锅炉效率由原来的49.3%增至79.4%;发电标准煤耗由原来的918.4g/kW·h降至611.25g/kW·h。The design strategy and implementation plan of the reconstruction of a 130t/h bubbling bed boiler into a circulating fluidized bed boiler with bottom refeeding of fly ash are described in detail, The main parameters of the boiler before and after reconstruction are analyzed and compared together with an economic analysis of the investment concerned. Results show that the reconstruction scheme intended for capacity enlargement and efficiency improvement are feasible; the steam output of the boiler is enlarged from 114.9 t/h to 144.6 t/h, the unit's power generation increased from 22.8 MW to 29.6 MW and the boiler efficiency raised from 49.3 % to 79.4%. While the standard coal consumption is being reduced from 918,4 g/kw· h to 611.25 g/kw. h. Figs 4, tables 3 and refs 5.
分 类 号:TK229.66[动力工程及工程热物理—动力机械及工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.112