西气东输管道工程陕西段新增土壤流失预测  被引量:3

Additional Soil Erosion Predication of Natural Gas Pipe Project from West to East in Shaanxi Province

在线阅读下载全文

作  者:付良勇[1] 寇权[1] 张鉴[1] 王存荣[1] 

机构地区:[1]黄河水利委员会西峰水土保持科学试验站,甘肃西峰745000

出  处:《水土保持通报》2005年第4期45-47,共3页Bulletin of Soil and Water Conservation

基  金:国家"十五"特大型重点基础设施建设工程

摘  要:西气东输管道工程陕西段全长346.20km,工程建设中扰动破坏原地貌和地表植被,产生大量弃土弃渣。经分析计算,新增土壤流失8.35×105t,其中扰动破坏原地貌新增土壤流失量为6.80×105t,占总流失量的81.41%;弃土弃渣流失量为1.55×105t,占总流失量的18.59%。扰动破坏原地貌造成新增土壤流失是防治的重点,必须采取切实可行的防治措施。The overall length of Shaanxi Province from West-to-East-Natural-Gas-Pipe-Project is 346.2 km. Due to the project construction, vegetation on the original land has been distroyed with a consequence of large quantity of deserted .soil, dregs and remains. According to analysis, newly additional soil erosion amounts to 8 354 000 tons, of which deserted soil is up to 6 800 000 tons, occupying 81.40 percent out of the total volumn, deserted dregs and remains is to up to 1 553000 tons, occupying 18.59 percent of the total. Practical measures are supposed to be taken to controll soil erosion caused by the project constrution.

关 键 词:西气东输 管道工程 新增土壤流失量 预测 

分 类 号:S157[农业科学—土壤学] TE122[农业科学—农业基础科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象