检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李江深[1]
机构地区:[1]山西省万家寨引黄工程管理局,山西太原030012
出 处:《科技情报开发与经济》2005年第16期149-151,共3页Sci-Tech Information Development & Economy
摘 要:万家寨引黄一期工程南干隧洞总长达100km,洞段的防渗设计尤为重要。由于采用了全断面双护盾掘进机(TBM)施工,因而管片衬砌结构自身特点决定了其接缝防渗构造的特殊性。隧洞的防渗设计包括管片衬砌防渗止水系统和接缝止水密封垫两部分。The total length of the tunnel of the first-stage construction of the Southern Main Line of Wanjiazhai YRDP is 100 km, the design of the seepage prevention of the tunnel section is very important. Because the TBM is adopted in the construction, the features of the duct piece liner structure determine the particularities of the joints' seepage prevention structure. The design of the seepage prevention of the tunnel includes two parts of the duct piece liner seepage prevention and watertight system and the joint watertight sealing plate.
分 类 号:U455[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28