检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]广州市建筑科学研究院新技术开发中心,广州510030
出 处:《广州建筑》2004年第1期17-21,共5页GUANGZHOU ARCHITECTURE
摘 要:广州国际会展中心主体砼结构部分为双向多跨超长大跨度肋梁板结构体系,且使用荷载较大。我们在结构中充分应用现代预应力砼技术,并根据结构中各主、次要结构构件的功能使用要求,把有粘结预应力砼技术和无粘结预应力砼技术结合应用,在不同的部位发挥各自的长处,很好地满足了设计及使用要求,且取得了非常好的经济效益。Two-way multi-span ribbed slab with big loads, which is super long and large-span, is applied in the main concrete structure of Guangzhou International Convention Exhibition Center. The modern prestressed concrete technology is employed in the design of the structure. According to the functional requests of the primary and secondary structure components, the bonded prestressed concrete technology and non-bonded one are applied together and taken advantage individually in different components. It is shown that the optimized design is successful and well satisfying with the functional request of the structure. And Good Economic benefit has been gained.
关 键 词:有粘结 无粘结 后浇带 无粘结预应力砼 结构优化设计 广州国际会议展览中心 广州国际会展中心 有粘结预应力砼 技术结合 结构体系
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49