检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张多新[1] 王清云[1] 白新理[1] 谢巍[1]
机构地区:[1]华北水利水电学院,郑州450011
出 处:《中国农村水利水电》2005年第9期66-69,共4页China Rural Water and Hydropower
基 金:国家自然科学基金资助项目(50079005)
摘 要:针对鸭池河水电站地下埋管外压稳定性问题,采用半解析柱壳有限条元法、Mises法和《水电站压力钢管设计规范》(SL281-2003)所推荐的方法对地下埋管的局部稳定性、整体稳定性、加劲环的稳定性进行了计算,并通过比较分析,得出一系列对压力钢管设计有参考价值的结论,供水电站地下埋管抗外压稳定性设计参考。This paper adopts the semi-analytical method of Cylinder-Shell Strip Finite Element Method, the Mises method, and the method recommended by The Design Specification for Steel Penstocks of Hydroelectric Stations to study the local stability, the entity stability, and the stability of the reinforcing ring of the underground penstock with the aim at the stability problem of the underground penstock stability under external pressure in the Yachihe Hydropower Station. A series of conclusions, which are valuable for the design of steel pipe with pressure, are derived through comparison and analysis. The results can provide references for the design of the penstock stability under external pressure in hydropower station.
分 类 号:TV732[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249