检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:曾鼎华[1] 张永兴[1] 阴可[1] 陈建功[1]
出 处:《水文地质工程地质》2005年第5期113-115,共3页Hydrogeology & Engineering Geology
基 金:国家自然科学基金(50378096);教育部科学技术重点项目(03138)
摘 要:通过对隧道变形监测中三角形量测法原理、计算公式的分析,认为公式中的三角形三边长度并不是收敛计的读数,两者相差一个收敛计本身的附加长度,这是使监测数据产生误差的原因之一。同时探讨了忽略收敛计附加长度引起的误差对监测结果的影响,并结合工程实例介绍了在实测过程中应注意的问题及误差原因。By analyzing the principle and formula for the displacement monitoring of tunnel, we found that the side-length of the triangle in the formula is not exactly equal to the convergence gauge's reading, which is longer for an additional length of the gauge itself. This is a reason for the error of monitoring result. Meantime, the affection caused by the ignorance of convergence gauge' s length was discussed in an actual case. Some critical issues and error-causes in practice were presented as well.
分 类 号:P221.1[天文地球—大地测量学与测量工程] U452.11[天文地球—测绘科学与技术]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117