检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王文营[1] 李宁[1] 齐勇[1] 张朱合 黄振霞
机构地区:[1]河北省电力研究院,河北石家庄050021 [2]石家庄热电厂,河北石家庄050041
出 处:《热力发电》2005年第9期5-9,共5页Thermal Power Generation
摘 要:对某厂2×410t/h循环流化床锅炉配200MW双抽供热机组进行常规法及测功法甩负荷试验,分析了应注意的问题,提出了试验操作的细则。对机组甩负荷后带厂用电运行对电网快速恢复的意义及实现的可能性进行了探讨,为类似机组的甩负荷试验提供了依据。Load rejection test of a 200 MW double extraction heatsupply unit matched with 2×410 t/h circulating fluidized bed (CFB) boilers in one power plant has been carried out by using conventional method and powermeasuring method, problems needing to pay attention being analysed, detailed rules for test operation being put forward, and the significance of unit to take auxiliary power in operation after load rejection for rapid restoration of network service, as well as the posibility of realiation for this being approached, providing basis of loadrejection test for other similar units.
分 类 号:TK227[动力工程及工程热物理—动力机械及工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28