检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:万景文[1]
机构地区:[1]电力工业部西北勘测设计研究院
出 处:《水力发电学报》1996年第2期22-29,共8页Journal of Hydroelectric Engineering
摘 要:本文结合黄河上、下游蓄、引水特点,首次提出龙羊峡、刘家峡两水库非汛期补水对缩短下游断流时间和增加下游工农业用水的估算方法,并利用1986—1992年非汛期实测资料,估算了相应数值,平均每年缩短了断流时间2.14个月,增加下游工农业用水量11.5亿m3,可增加下游灌溉面积约29.4万ha,为缓解黄河下游水量供需矛盾做出了重要的贡献。The article, in accordance with the characteristics of water impoundment and discharge of the projects on the Yellow River, Suggests an approach to estimate the reduction of the outage time and the increase of water supply on the lower reaches of the Yellow River in the low water period with the Longyangxia and Liujiaxia reservoirs' joint operation. Based on the analysis of the measured data from 1986 to 1992, it is concluded that during the low water season on the lower reaches of the Yellow River, the outage period was annually shortened by 2. 14 months, the water supply was increased by 1. 15 Gm3, therefore, the 2 reservoirs make a great contribution to easing the water shortage on the lower reaches of the Yellow River.
分 类 号:TV67[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.236