南水北调中线穿黄隧洞施工对盾构的性能要求浅析  

A Primary Discussion on Performance Requirements of Tunneling Shields in the Tunnel Construction through Yellow River in the Middle Line of Water South to North

在线阅读下载全文

作  者:乔世珊[1] 张治平[1] 史晓明[1] 

机构地区:[1]北京市白广路2条2号水利部综合事业局,100053

出  处:《工程机械》2005年第10期1-3,共3页Construction Machinery and Equipment

摘  要:南水北调中线穿黄隧洞(长度4.25km)工程地质条件复杂,隧洞外侧水土压力大,采用加装滚刀的泥水加压式盾构施工较为合适,施工技术难点多,难度大,对盾构的性能要求高,盾构必须在适应性、主要设备系统性能及技术服务等方面满足工程需要。The geological conditions of tunnel through Yellow River (total length 4.25km) in the middle line of water south to north project are very complicate and the water soil pressure is very high outside the tunnel. Slurry-water-pressurizing shield with additional rolling cutter is more suitable. But many technical problems will occur and great difficulties may be faced. The shield must achieve high performance requirements. The adaptability, system performance of main equipment and related technical service must meet the construction requirements.

关 键 词:南水北调中线 穿黄隧洞 盾构 地质条件 双层衬砌结构 输水隧洞 

分 类 号:TV554[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象