用针铁矿法从锌焙烧烟尘的热酸浸出液中除铁  被引量:16

Iron Removal from Hot Acid Leaching Solution of Zinc Roasting Dust by Goethite Process

在线阅读下载全文

作  者:赵永[1] 蒋开喜[2] 王德全[1] 郭亚会 

机构地区:[1]东北大学材料与冶金学院,沈阳110004 [2]北京矿冶研究总院,北京100044 [3]葫芦岛锌厂,辽宁葫芦岛125003

出  处:《有色金属(冶炼部分)》2005年第5期13-15,共3页Nonferrous Metals(Extractive Metallurgy)

基  金:国家自然科学基金重点项目(50234010)

摘  要:研究了从锌焙烧烟尘常压热酸浸出液中沉淀针铁矿的过程。试验结果表明,反应时间和空气流量对除铁率的影响不显著,而反应温度和溶液终点pH是除铁过程的主要影响因素。在终点pH3.0、反应温度333 K、反应时间2 h、空气流量0.2 m3/min的条件下,除铁率超过99.5%,溶液中铁浓度可由40g/L降至0.1 g/L以下。Precipitation process of the goethite from hot acid leaching solution of zinc concentrate roast dust was investigated. Experimental results indicated that the effect of reactive time and volume of air flow on the rate of iron removal is not significant, but temperature and final pH of solution are main influence factors for the iron removal process. On the optimum condition of iron precipitation: final pH value is 3.0, 333 K, reactive time is 2 h, air flow is 0.2 m^3/min, the ratio of iron removal exceeds 99.50 % and the concentration of Fe in solution can decrease from 40 g/L to below 0.1 g/L.

关 键 词:焙烧烟尘 热酸浸出 除铁 针铁矿法 

分 类 号:TF813[冶金工程—有色金属冶金]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象