检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]长江科学院,湖北武汉430010
出 处:《水利水电技术》2005年第10期17-19,26,共4页Water Resources and Hydropower Engineering
摘 要:通过水工模型试验方法,研究了三峡电站进水口平面快速事故闸门关闭过程中的水力特性及闸门持住力等有关问题。分析了模型试验的相似性问题,然后对影响闸门持住力的几个要素分别进行了分析和验证,从而获得了能降低闸门持住力的几种可行性措施,并给出了确定启闭机容量的有关参数。Based on hydraulic model test, the hydraulic characteristics of the quick-acting emergency plain gate for the power station of Three Gorge Project during its action and the holding force of the gate are studied herein, in which the comparability the model test is analyzed, and then the main factors effected on the holding force of the gate are analyzed and verified respectively. From the study, some available measures for lowering the holding force of the gate are obtained and the related parameters for determining the capacity of the gate lifter are put forward as well,
分 类 号:TV732.1[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.13