关于青藏铁路路基工程施工技术问题的讨论  

A Discussion on Construction Techniques for Embankment of Qinghai-Tibet Railway

在线阅读下载全文

作  者:胡三喜[1] 

机构地区:[1]铁道第一勘察设计院,陕西西安710043

出  处:《桥梁建设》2005年第5期60-62,67,共4页Bridge Construction

摘  要:根据青藏铁路高寒、缺氧的施工地理条件和多年冻土工程性质随季节变化的规律,简要论述了高原路基工程施工时间、进度和填料选择控制的方法。特别指出多年冻土路基施工质量的控制和检测要贯穿于施工的整个过程,并要求尽可能多采用现场测试,特别是采用现代化的快速高自动化测试手段。In the light of the geographic conditions that are characteristic of exceptional cold- ness and anoxia for construction of Qinghai-Tibet Railway and the regularities of changing of everfrozen ground there with seasons, this paper describes in brief the construction time, progress and selection of filling materials for the embankment of the Railway at Qinghai-Tibet Plateau, and also points out that the quality control and inspection for construction of the embankment at the ever-frozen ground should be carried out throughout the whole process of the construction, and site inspection and tests, particularly the modern, rapid and highly automatized inspection and test means, should be applied as possible as they can be.

关 键 词:青藏铁路 多年冻土 施工方法 检测 

分 类 号:U416.04[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象