机构地区:[1]大唐陕西石泉水力发电厂,陕西石泉725200
出 处:《水力发电》2005年第9期39-41,57,共4页Water Power
摘 要:倒垂线是大坝位移监测的主要设施之一,常与引张线和正垂装置配合使用,具有较高的监测精度。石泉水电站于1998年开始实施大坝监测系统自动化改造工程。大坝规划设置5条坝顶倒垂线。倒垂孔施工过程中,对钻孔及纠偏,孔斜检测,保护管安装及埋设,锚块、垂线安装及埋设,浮体组安装等,均采取了严格的技术措施;对坝左倒垂孔孔斜偏差超标提出了有效的解决办法,实施效果良好,保证了倒垂孔的安装精度。The reversed pendent hole is one of primary methods in dam displacement monitoring by means of cooperating with tensional line and the perpendicular device. The automation rehabilitation project of Shiquan dam monitoring system was put into practice in 1998. Five reversed pendent holes were arranged in Shiquan dam. In the course of constructing reversed pendent hole, the strict measures were used in boring hole, surveying degree of inclined line, correcting its error, and installing protective steel tube, anchor, the line of perpendicular, and buoy. The effective method of correcting lean super-scale in left reversed pendent hole was brought forward. The results were satisfactory, and the installing precision of reversed pendent hole was ensured.
关 键 词:混凝土坝观测 倒垂孔 施工技术 石泉水电站 石泉大坝 技术探讨 施工过程 坝顶 安装精度 系统自动化
分 类 号:TV642.32[水利工程—水利水电工程] TS117[轻工技术与工程—纺织材料与纺织品设计]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.15.203.168